AC Water & Sewer Group 1033
Group Job 1033 includes approximately 3.85 miles of water and 1.90 miles of sewer replacement in Downtown San Diego.
Otay Mesa East Land Port of Entry Offsite and Onsite Wet Utility Design
The Otay Mesa East Land Port of Entry is a new border crossing for both commercial and private vehicles in an effort to decrease wait times and fuel binational trade.
MST SURF!
The Monterey-Salinas Transit SURF! Project will add a six-mile busway, extensions to the Beach Range Trail, and new transit stops in an effort to increase public transit through the Monterey Peninsula.
Mission Center Canyon C Sewer Main Replacement
The Mission Center Project is replacing and rehabilitating existing sewer mains, including associated sewer laterals and manholes within the Serra Mesa community.
SR-52 Drainage Design
SR-52 Drainage Design includes rehabilitating SR-52 between PM 5.1 and 9.0.
I-5/SR-56 Interchange Project
The I-5/SR-56 Interchange Project will improve local and regional traffic on two major freeways by adding an HOV Operational lane in each direction on SR-56 and a direct connector from WB SR-56 to NB I-5.
Palm Ave Interchange I-805
The Palm Ave Project will enhance traffic operations at the I-805/Palm Ave intersection and improve bicycle and pedestrian access on Palm Avenue.
HW101 Carpinteria to Santa Barbara
The HW101 Project will improve traffic flow by increasing number of lanes, reconstructing interchanges, and performing rehabilitation to existing pavement.
San Carlos Interconnect and Transmission Pipelines
The San Carlos Interconnect Project involves replacing water lines and constructing new pipelines to improve the reliability and redundancy of the City's water system in the community of San Carlos.
La Playa Concept & Guidelines
The La Playa Concept and Guidelines reduce shoreline erosion, improve public coastal access, and provide a planting pallet to create a consistent appearance.
Fairmount Bridge Replacement
The Fairmount Bridge Replacement Project will improve path of travel for vehicles, cyclists and pedestrians.
​
Ocean Boulevard Improvement Project
The Ocean Boulevard Improvement Project will provide bluff and roadway protections from the accelerated and episodic bluff erosion resulting from a recent series of storms.
Mid-Coast Light Rail Trolley
This $2.1B project extends the Trolley service from the Santa Fe Depot in Downtown San Diego to the University community area.
​
Gilman Bridge I-5 Crossing
Gilman Bridge is a new overcrossing over Interstate 5, just north of the La Jolla Village Drive Interchange. Construction of the overpass was concurrent with the Mid-Coast Trolley project.
Voigt Drive Widening
The Voigt Drive Improvements project will provide access to the future Voigt Drive Trolley Station - a part of the Mid-Coast Trolley project.