AC Water & Sewer Group 1033

Group Job 1033 includes approximately 3.85 miles of water and 1.90 miles of sewer replacement in Downtown San Diego.

Otay POE.jpg

Otay Mesa East Land Port of Entry Offsite and Onsite Wet Utility Design

The Otay Mesa East Land Port of Entry is a new border crossing for both commercial and private vehicles in an effort to decrease wait times and fuel binational trade.

image-coming-soon_edited.jpg

MST SURF!

The Monterey-Salinas Transit SURF! Project will add a six-mile busway, extensions to the Beach Range Trail, and new transit stops in an effort to increase public transit through the Monterey Peninsula. 

Sandag-Logo.png
cosd-logo-stacked-full-color-72ppi.png
wsp logo_edited.jpg
MST.png
kimley horn logo_edited.png
Mission Center MH.jpg

Mission Center Canyon C Sewer Main Replacement

The Mission Center Project is replacing and rehabilitating existing sewer mains, including associated sewer laterals and manholes within the Serra Mesa community.

SR-52 - WB.png

SR-52 Drainage Design

SR-52 Drainage Design includes rehabilitating SR-52 between PM 5.1 and 9.0. 

SR-56.jpg

I-5/SR-56 Interchange Project

The I-5/SR-56 Interchange Project will improve local and regional traffic on two major freeways by adding an HOV Operational lane in each direction on SR-56 and a direct connector from WB SR-56 to NB I-5.

wsp logo_edited.jpg
cosd-logo-stacked-full-color-72ppi.png
Caltrans.svg.png
kimley horn logo_edited.png
Caltrans.svg.png
kimley horn logo_edited.png
Palm Aerial_sm.png

Palm Ave Interchange I-805

The Palm Ave Project will enhance traffic operations at the I-805/Palm Ave intersection and improve bicycle and pedestrian access on Palm Avenue. 

SB-101_sm2 use_edited.jpg

HW101 Carpinteria to Santa Barbara

The HW101 Project will improve traffic flow by increasing number of lanes, reconstructing interchanges, and performing rehabilitation to existing pavement.

Near Eagle Ridge Pump.jpg

San Carlos Interconnect and Transmission Pipelines

The San Carlos Interconnect Project involves replacing water lines and constructing new pipelines to improve the reliability and redundancy of the City's water system in the community of San Carlos.

Caltrans.svg.png
cosd-logo-stacked-full-color-72ppi.png
tylin logo.png
cosd-logo-stacked-full-color-72ppi.png
Dokken-Logo.png
Krebs Logo.png
13_TRAIL - 855 SAN ANTONIO LOOKING NORTH

La Playa Concept & Guidelines

The La Playa Concept and Guidelines reduce shoreline erosion, improve public coastal access, and provide a planting pallet to create a consistent appearance.

Fairmount Bridge.png

Fairmount Bridge Replacement

The Fairmount Bridge Replacement Project will improve path of travel for vehicles, cyclists and pedestrians.

​

Pismo 2.PNG

Ocean Boulevard Improvement Project
 

The Ocean Boulevard Improvement Project will provide bluff and roadway protections from the accelerated and episodic bluff erosion resulting from a recent series of storms.

Picture1.png
cosd-logo-stacked-full-color-72ppi.png
Dokken-Logo.png
Pismo Beach Logo_cropped.jpg
Engeo logo.png
122218-135.JPG

Mid-Coast Light Rail Trolley

This $2.1B project extends the Trolley service from the Santa Fe Depot in Downtown San Diego to the University community area. 

​

Picture3.jpg

Gilman Bridge I-5 Crossing

Gilman Bridge is a new overcrossing over Interstate 5, just north of the La Jolla Village Drive Interchange. Construction of the overpass was concurrent with the Mid-Coast Trolley project. 

Voigt Drive_edited.jpg

Voigt Drive Widening

The Voigt Drive Improvements project will provide access to the future Voigt Drive Trolley Station - a part of the Mid-Coast Trolley project.